Maria Galanta – Commissioning

This Monday, May 15, 2023, the first passengers were finally able to board the Maria Galanta ☀ Announced and highly anticipated, it is an immense joy to see the commissioning of the new ship of the NGV company 🌊 More spacious, faster, more comfortable, the Maria Galanta is a real umbilical cord […]
Rehabilitation of the Houphouët Boigny bridge in Abidjan (Ivory Coast)

Study and Design of Barges – Eiffage (Ivory Coast)

In 2022, our subsidiary Peschaud Côte d'Ivoire, specialized in special works, brought its logistical expertise to Eiffage Energie Systèmes – T&D for the installation of pylons in the lagoon as part of the 400KV TABOTH-bi-tern line construction project. PK24-AZITO. In total, 4 pylons were installed during this […]
Maria Galanta Project (Gabon)

LCT (landing craft vessels) operating between Mozambique and Cameroon

BP GTA Project – For Eiffage (Senegal)

Les Rochambelles – Construction of CB19 ships (South Africa)

Adélie – Mobile Port Terminal (Mozambique)

WNPOC – Block 5B (South Sudan)

Esso Project (Chad)

In 2001, Peschaud won a land logistics contract on behalf of Schlumberger as part of the Esso project in Komé. For more than twenty years, Peschaud Tchad has successfully carried out all the logistics support operations for the drilling campaigns at the Komé, Mangara and other sites, thus establishing its reputation as a rigmover […]