In 2022, our subsidiary Peschaud Côte d'Ivoire, specialized in special works, brought its logistical expertise to Eiffage Energie Systèmes – T&D for the installation of pylons in the lagoon as part of the 400KV TABOTH-bi-tern line construction project. PK24-AZITO.
In total, 4 pylons were installed during this first phase of the project across the Ebrié lagoon in the Songon region. 🚧
Our role in this project: The study and design of the barges necessary for lagoon operations, and the carrying out of associated operations.💡🛠
For this we mobilized: 👉 40 modular boxes which served as drilling support for the construction of the piles, the installation of prefabricated beams using a ballast system already tested on the Félix Houphouët Boigny Bridge rehabilitation site, support for the assembly of pylons but also transport solutions. ⚓ 👉Our ship Maxime (multicat) supports these operations. 🛥
We are delighted to have seen this phase successfully completed and of this collaboration with Eiffage Énergie Systèmes in Côte d'Ivoire. 🙏